Metrics
Current cost
The ideal-structure cost is what the work could have cost with an ideal structure. The current cost is what the same finished changes did cost with today's structure: the ideal-structure cost plus the sync tax.
A 20-hour change can become 60 or 80 hours because it drags in other domains, other teams, meetings, and reviews. Convert those hours with the cost per engineering hour and you get the current cost. The gap between it and the ideal-structure cost is the sync tax, and the current cost divided by the ideal-structure cost is the sync tax multiplier.